KANGDA 2Q55 / BH2Q85R8 – Fuel Pump Assembly For Yangdong 2108

KANGDA 2Q55 / BH2Q85R8 – Fuel Pump Assembly For Yangdong 2108

1. Product: 2Q55 / BH2Q85R8
2. Compatible Equipment: Diesel Fuel Injection Systems
3. Manufacturer: Aftermarket OEM Replacement
4. Condition: Brand New, Fully Tested
5. Origin: ABOSEDE Diesel
6. Shipping period: 3-5 business days
7. Payment terms: T/T, Western Union, PayPal

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction

The KANGDA 2Q55 (pump core BH2Q85R8) is a mechanical in-line fuel injection pump engineered for the Yangdong 2108 two-cylinder diesel, rated at 32 HP with a governed speed of 2600 RPM. This assembly manages fuel metering and pressurization for agricultural prime movers operating in high-dust, variable-load environments across Africa and Southeast Asia.

🔩 Core Specifications & Pump Configuration

The BH2Q85R8 pump body houses an 8.5 mm plunger paired with a camshaft driven directly off the engine gear train. The 2Q55 ordering code specifies the complete assembly including the mechanical governor, delivery valves, and mounting flange pre-set for the 2108 combustion characteristics. Operating at 19–20 MPa injection pressure, this unit delivers fuel atomization suitable for the engine's 18:1 compression ratio and 2.144 L displacement. The SPLIT flange design enables direct bolt-on fitment without modifications. The pump sump requires SAE 30 or 15W-40 diesel oil for internal camshaft and tappet lubrication-separate from the fuel passing through the low-pressure gallery.

🛣️ Application Scope – Yangdong 2108 & Compatible Platforms

Primary fitment is the Yangdong 2108 naturally aspirated diesel, found in compact tractors, power tillers, combine harvesters, and stationary gensets common in emerging-market agricultural operations. The BH2Q85R8 also cross-references to compatible Changchai and certain Jiangdong platform engines utilizing the same mounting pattern and gear drive configuration. For workshops supporting mixed fleets, stocking this pump covers a significant portion of the Asian-sourced 2-cylinder diesel segment-particularly machines operating in off-grid and rural service conditions where parts availability determines downtime.

📐 Installation & Timing Protocol

Parameter Requirement
Static Timing Check Dial indicator on plunger lift-verify against 2108 spec
Gear Alignment Timing marks on pump gear + intermediate idler must align
Mounting Bolts M8 x 35 retaining bolts, torque to spec
Sealing Replace copper washers on banjo bolts (inlet/return)
Lubrication Fill Fill pump housing with diesel-grade oil before startup
Bleeding Crack high-pressure lines at injectors, crank until fuel flows

The gear-driven pump mounts to the timing cover; misalignment during installation causes retarded injection resulting in power loss or advanced timing leading to knocking. The static timing mark on the pump flange must align with the mark on the front plate-scribe your own reference if factory marks are obscured, a common field practice. When rotating the engine to TDC on compression stroke for #1 cylinder, ensure the pump drive gear mark corresponds to the pointer on the timing gear case. If the pump is removed, mark the drive hub and gear position before disassembly-dropping the woodruff key or misplacing the drive hub bolts causes timing errors that require gear cover removal to rectify.

⚙️ Service Life & Common Failure Points

The BH2Q85R8 typically exceeds 4,000 operating hours with regular sump oil changes and clean fuel. Primary failure modes observed in high-hour applications include:

Camshaft lobe wear from contaminated pump oil

Plunger seizure due to water ingress in fuel

Governor spring fatigue affecting idle stability

Delivery valve leakage causing secondary injection and rough running

The mechanical governor system is adjustable but requires test bench calibration for precise fuel delivery across the RPM range. In field conditions, verifying rack travel and maximum fuel screw setting against the engine's 32 HP rating prevents over-fueling and black smoke. For workshops without calibration equipment, sourcing the complete 2Q55 assembly is more reliable than in-house plunger-and-barrel replacement.

FAQ – Sourcing & Field Repair

Q1: Is the KANGDA 2Q55 a direct exchange for the original pump on Yangdong 2108 engines?
A: Yes, the 2Q55 assembly with BH2Q85R8 core is the OEM-spec replacement. However, even with a direct swap, verify the static timing using a dial indicator-gear mesh position can vary and the factory scribe marks may be obscured on high-hour engines.

Q2: Can this pump run on biodiesel blends or high-sulfur fuel common in African markets?
A: The hardened steel plunger and barrel tolerate varied fuel quality, but high-sulfur fuel accelerates wear. Using a diesel additive with lubricity enhancers is recommended for ULSD and biodiesel blends.

Q3: The lift pump failed and diesel is leaking into the injection pump housing-how to fix?
A: This occurs when the lift pump diaphragm seal fails. The replacement 2Q55 includes the lift pump mechanism. Many workshops bypass the mechanical lift pump and install an external electric pump to prevent recurrence.

Q4: What is the typical symptom of a worn BH2Q85R8 pump on a Yangdong 2108?
A: Hard starting when warm, loss of power under load, erratic idle, and increased exhaust smoke indicate plunger wear or governor malfunction.

Q5: Are the pump flange mounting bolts and timing cover gasket included?
A: The assembly includes the pump only. Order mounting gasket and copper sealing washers separately-these are critical for preventing oil leaks and air ingress.

 

Basic Information about the Company

 

202510091606539026

 

 

2

3

4

 

Flexible Payment Methods for Your Convenience

 

To make your purchasing experience smooth and easy, we offer a variety of secure payment options:

product-750-750

Bank Transfer

Pay directly in 15 supported currencies.

west union

Western Union

Quick and global money transfers.

PayPalLogo2014-1024x1014

PayPal

Safe and convenient online payment.

ae99cd49-2667-464e-b9db-b39cee0126e1

Alibaba

Enjoy extra protection with trusted Alibaba transactions.

We're here to make your order process worry-free - choose the payment method that works best for you!

 

Shipping Made Simple

6

Customer reviews

 

8

Hot Tags: kangda 2q55 / bh2q85r8 – fuel pump assembly for yangdong 2108, China kangda 2q55 / bh2q85r8 – fuel pump assembly for yangdong 2108 manufacturers, suppliers, factory

You Might Also Like

(0/10)

clearall